Created by Rona Sheen, last modified on Apr 12, 2019
Goal of the Program-Level Kanban Board
- Program higher level overview and tracking of features throughout the development process
- To empower anyone to access this hub of information
Proposed Tweaks
Notes
- Labels link together related Epics
- Feature Requests can exist without being tied to an Epic.
- An epic exists if a feature is too large to live as an individual feature request.


"Feature Request" ticket types are the types that move through this board.
| Step 1 - Funnel (Intake List) | - All Feature Request tickets start here. This is a prioritized backlog of feature requests.
- Feature Requests can range from loosely defined to more defined
- Higher prioritized items should have more defined requirements/descriptions
- Feature Requests can exist without being tied to an Epic.
- An epic is created if a feature is too large to live as an individual feature request.
- Labels link together related Epics and Feature Requests
It's possible to tag or label on a feature request that isn't prioritized yet and filter on the Kanban board to not display those. |
eStep 2 - "Framing" (Previously "Analysis" in current DCWW/ABC Brand board) (Assess Business Value, Assess Research, Assess Design Exploration) | Feature Request moves this Step 2 - Framing when: - Feature Request ticket is ready to be picked up for further business value assessment, research, or design exploration.
- Feature Request ticket should be defined enough to be able to be picked up by design to explore. Sometimes, a title and brief description can suffice.
- Design can be tapped to start explorations through an informal chat or kick-off by the Feature's Lead Product Manager. Or, Design can pick up a feature request to explore if they have extra time from ongoing major features.
- Example: GAM needs a lot more resources at the moment, so Design has extra time to tackle the next-highest prioritized Funnel Feature Request that needs designs.
While in Step 2 - Framing: - Assessing Business Value
- Product team determines Feature Product Lead, who then fleshes out Feature Request ticket more with requirements. Collaborative with Design if design is required–Design contacts determined.
- Assessing Research
- Product and Design evaluate and/or conduct research as needed.
- Assessing Design Exploration
- Designers will have their own internal design team review flow and feedback.
- Designers will also collaborate and review with Feature Product Manager throughout exploration.
- When designs are ready and have been reviewed with Feature Product Manager, early spec reviews for engineering feedback can also happen.
- Once Designs are reviewed and approved by Feature Product Manager, Feature Request ticket moves to step 3.
- After explorations are reviewed, Feature Product Manager should continue to assess:
- Does the business case make sense? Does Product want to move forward with this feature now knowing more of the research, designs, and constraints?
|
Step 3 - Analysis (Share-out Designs, Scoping, Legal, LOE) This column is "new" but really is a more broken out column of the existing "Analysis" columns on DCWW/ABC Brand board.
| Moves into this Step 3 - Analysis when: - Design has finished bulk of feature ticket's exploration.
- Designs have been reviewed and approved for larger share-outs by Feature Product Manager.
- Feature Request is ready to be reviewed more formally with the broader Product team as well as Legal or any other impacted teams (i.e. CP / EIA engineering teams).
While in Step 3 - Analysis: - Features and/or Designs are reviewed more formally with the broader Product team as well as Legal or any other impacted teams (i.e. CP / EIA engineering teams).
- Based on broader team feedback and scoping:
- Iterations on design and requirements happen based on feedback.
- Product team continues to evaluate if the business case makes sense.
- Feature Product Manager completes requirements documentation
|
Step 4 - Platform Ticket Creation (Requirements Ready, Platform Tickets To Be Created) | Moves into this Step 4 when: - Feature Product Manager has completed requirements documentation and is ready to create platform-level tickets.
- Appropriate share-outs and sign-off have happened by impacted teams.
While in Step 4 - Based on share-out discoveries, any larger stories can be broken down at this point to smaller stories on platform level boards.
- Feature Product Manager and Platform Product Manager(s) create or clone to platform-level tickets.
- Feature Requests are qualified as "dev ready"
|
Step 5 - Execution (Work is started on Platform Tickets) | Moves into this Step 5 - Execution when: - Feature Product Manager and Platform Product Manager(s) have finished cloning or creating to platform-level tickets.
- Stories on Platform Tickets begin at status "Dev Ready" and are ready for Platform team grooming.
While in Step 5 - Execution: - Engineering teams have platform tickets. They can groom tickets and start work.
- Stories under platform epics are now marked “Dev Ready" and moves along the engineering execution workflow.
|
Step 6 - Resolved (Not Shipped/Enabled)
| A column for feature requests that are not enabled in Product builds yet. |